Large 80-100m freezer trawlers
Main target catch
Activity
Fishing trip: 1-2 months
Average landings: 10-12 thousand tons per year
Crew of 27-30 people
Function
Benefits
The demonstration vessel as presented by Skipasyn and Shipcon. An overview of the processing area. Fish is landed through the chutes at the left hand side. The silage grinder and transportation unit is located in the left hand corner of the figure.
A snapshot showing both the bulk and plate freezers, where there is constant input of raw material.
The fishmeal and fish oil production unit located below the processing deck.
Download 3D PDF model
Citation :
Factsheet Large 80-100m freezer trawlers, Author(s) : Birgir Sævarsson, Marvin Ingi Einarsson, Piotr Szymczak & Sigurður Örn Ragnarsson
Vioarsson, J. R., Ragnarsson, S. O., Einarsson, M. I., Saevarsson, B., Szymczak, P. (2017). DiscardLess WP5.4
Report on the 3D drawings and cost-benefit tools developed for Icelandic, North Sea and Bay of Biscay case studies.
http://www.discardless.eu/adapting_fishing_vessels